博文

What is ASTM A234 WPB

 ASTM A234 is Standard Specification for steel pipe fittings includes carbon and alloy steel material for moderate and high temperature services. It covers steel fittings of seamless and welded types. Steel Pipe fittings are applied in pressure pipelines and in pressure vessel fabrications. These fittings material consist of killed steel, forgings, bars, plates, seamless or HFW (fusion welded) pipe products, with filler metal added. ASTM A234 includes wrought carbon steel and alloy steel fittings of seamless and welded construction covered by the latest revision of ASTM B16.9, B16.11, MSS-SP-79, MSS-SP-83, MSS-SP-95, and MSS-SP-97. etc. As we know, ASTM A234 steel pipe fittings are used in pressure piping and in pressure vessel fabrication, for services at moderate and elevated temperatures. The fittings material in this standard consist of killed steel, forgings, bars, plates, seamless or fusion-welded tubular products with filler metal added. In this standard it covers the specif...

Actively Feedback from Singapore customer

 In January, a Singapore customer sent an inquiry about flanges to Tianjin Xinyue. Although it was already evening when we received the inquiry, we confirmed the flange pressure, material, and customer construction date. After timely communication with customers, we learned that customers need to use flanges in early Feb. They have already asked stock in Singapore but failed. After learning that customers' needs are urgent, Tianjin Xinyue confirms the proposal with the warehouse and the fastest delivery time to the customer. Only one week away from the Chinese New Year holiday, the customer is very satisfied with our on-time proposal and fully trusts Tianjin Xinyue, Customer immediately paid the full amount in the afternoon after receiving our specific quotation. With the rapid cooperation of various departments, we caught up with the expected ship as scheduled, and completed the shipment on the last day of the holiday. Even during the Spring Festival holiday, Tianjin Xinyue did no...

Xinyue Steel Group Shipped UAE GI COIL Order Successfully

 In the middle of January 2020, Xinyue received an enquiry for galvanized coil from our UAE old customers , the qty are 75 tons, the required delivery are 15 days,we quoted the best price to client in time and informed the customer that the minimum order quantity is 100 tons for 275g zinc layer thickness coil , the customers readily agreed. Because last year we shipped the same specifications of the 110 tons of galvanized coil, the client is very satisfied with the quality of our products, so he confirmed the contract immediately and paid the advance payment during the Spring Festival holiday. This Spring Festival, due to the outbreak of the epidemic, the factory resumed work later than usual, but our company quickly completed the production of this batch of galvanized coils in 5 days after we resumed work, and booked the shipment date ETD 29 Feb, now all the goods have been loaded and ready for shipment. It is believed that this batch of goods will be favored by the customers as l...

Qatar Customer Order Finished Successfully

 At end of 2019, we got a inquiry of series steel products include square pipe and SMLS with high steel grade from new Qatar customer. After receive the inquiry Xinyue recognize that the customer pay more attention to the products quality and informed that once Xinyue can produce the pipes with approved quality, customer hope to build a long term relationship with Xinyue. Due to close to Spring Festival, the production schedule is very busy, All orders are hurried to be shipped before spring Festival. Customer requires that pipes need to be delivered before March. In order to meet the project needs, after discussing with mill, we decided to use the available stocks of steel plates, and produced the pipe in advance. Now the pipes are basically finished the production. Xinyue team provided the suitable and professional solution to customer then. And provide the professional service during the project tender period. Finally customer decide to cooperate with Xinyue team under the profe...

Wrought steel pipe

 What is wrought steel Wrought steel material refers to product forms (forged, rolled, ring rolled, extruded…), while forging is a subset of wrought product form. Difference between wrought steel and forged steel 1.The main difference between wrought and forged steel is strength.Forged steels are tougher than wrought steels as they begin as a casting which is then forged which adds to its durability. Wrought steel is less likely to be used in high-tension applications and it may be harder and more brittle than forged steel. 2.Wrought is any hot or cold working of metal, and is therefore a description under which you would find forging, rolling, heading, upsetting, drawing, etc. 3.Forging is the open (including hammer and anvil or closed die forming of metal heated to forging temperatures. 4.Forged steel is more durable in certain applications because, although it begins life as a casting as well, it is hammer forged using large hydraulic hammers that force the atoms and molecules o...

Bridge Replacement SSAW API 5L GR.B 1200MM piles delivered

 Xinyue Steel Group received a new order of SSAW API 5L PSL1 GR.B ID1200 X 16MM X 11.8M on Nov, 2019. However, the end user offered some extra technical requirements which made the entire progress very slow. After struggled with client, end user, TPI and production department for about 1 month, there’s finally an agreement on every details at the end of December. Another trouble is that all raw material are too busy to take new schedule for this small job since it’s peak season during December, they’re totally fulled on production lines. The purchase dept finally ordered to the mill with higher cost but fastest delivery time, hope we can deliver all pipes as earlier as we can after knowing it’s urgent needed by the project. However, all raw material arrived at factory at the end of January 2020 when it’s Spring Festival holidays, which means this order should be produced after spring festival. Then all country entered an emergency period of epidemic prevention for the corona virus,...

Xinyue Steel Has Been Awarded Australian Water Pipeline Project

 At the beginning of March, our Australian regular client has well received the awarding letter from global famous construction company as scheduled. Xinyue steel have continuously offered our competitive quotations and professional suggestions since we received the initial MTO of this water transmission project in last June. The 1st stage of this project was 12.6KM water pipeline, including API PSL2 X42 DN400 18meter length ERW steel pipe and relevant flanges & bends. Due to our previous successful supplying experience and high QA feedback, we have been awarded this project and received the confirmed PO & deposit in a very short time. As the COVID-19 global epidemic situation getting tougher day by day, client worried so much about the delivery time and shipment. Xinyue sales earnestly worked a detailed production and delivery schedule with attached professional WPS & ITP to client, and patiently explained China epidemic situation has been well controlled, most of mill...