Transverse crack after lsaw steel pipe measures rework appear, specifically: 1. Confirm defect All welds 100% UT inspection, crack marked location, length, depth and direction. If the entire weld has defects, the proposed dig out the entire re-submerged arc weld, partial repair is recommended SMAW. 2, Planing preheat Preheating temperature is 110-170 ℃, preheating temperature weld both sides of the detection position is not less than 150mm, the heating is within the range of from defects around 500mm. 3, Gouging Gouging out both ends of the range of cracks, weld integrity is not less than 50mm Outbound middle gouging, gouging ends gently to smooth the transition, the transition surface and a vertical line at least greater than 45 °. Gouging carbon rod angle should be at 60 ° or less, particularly in the crack to arrive at an angle as small as possible. 4, Polished Polished to no black, polished surface after the transition should be smooth, there sho...