博文

目前显示的是 一月, 2022的博文

Ghana Bridge Piling SSAW Steel Pipe Delivered Successfully

 During 2018, Tianjin Xinyue Steel join a bid together with the customer in Denmark. After won the bid Xinyue has been providing spiral steel pipe used for Ghana bridge construction project, after one year later, the good quality and excellent service has won the acceptance of the customer, in July this year, customer plan to purchase more SSAW use in the project of the second phase. The standard requires API 5L PSL1 Grade B with high quality technical requirements. After the quick communication with the technical department and the production department, we quoted the best price to the customer very soon. During the negotiation and confirm on the price, payment term, coating, standard and production control. We known that the pipes must produce according to API standards, and the latest delivery date of this batch of steel pipes must be before 10th,Sept. According to the strict requirements of customers for delivery, we discussed with the production department to shorten the produ...

Xinyue Support to Build the Lion City-Singapore

 In mid-August of 2019, we received an inquiry from our Singapore customer. This customer we have been been working with each other for 4 years. Customer urgently needs to purchase 100 tons of scaffolding steel pipe as stock use for the city construction. After receiving the enquiry, we communicated with production department for the best production time, and arranged the production as soon as we receive the deposit. With the joint efforts of all departments of Xinyue Group, we finally completed the production within the delivery period requested by our customer. Customer is very satisfied with the fast delivery time and our service, and expressed his willing to continue the cooperation with Xinyue as a long-term partner. At present, the products have been successfully shipped to Singapore. Considering of the requirements that customers need the best quality of the goods, our company communicated with freight forwarder and arrange a special reinforcement during container stuffing. ...

South American Stainless steel Tee shipped smoothly

 At the end of July this year, Xinyue received an inquiry for sanitary stainless steel tees from South America. This customer is the first time to send an inquiry to us. Xinyue people treat each new and old customer with professional and high-quality service attitude regardless of the order size. After receiving the customer's product draft and specifications, we quickly gave the quotations to the destination port. After receiving the quotation, the customer told us the quotation was reasonable and the delivery date was in line with expectations. After a week of mail communication, the two parties signed this contract . After receiving the payment, Xinyue immediately put into production. We have more than 20 years of experience in producing such fittings, and Every one of Xinyue is responsible for their due diligence, and the completion time is several days ahead of schedule. In the production process, we have already arranged the booking,After the completion of the production, the...

How to operate the surface pretreatment of seamless steel pipe?

 The outer galvanized and inner plastic coated steel pipe of seamless steel pipe, like the plastic coated steel pipe, takes the steel pipe as the base pipe. The pipe is a steel pipe with internal and external coating. Generally, the inner coating is plastic for anti-corrosion. The outer coating can be about the galvanized layer of plastic according to the needs of users, or it can be another coating raw material. Therefore, the surface pretreatment of the base pipe shall be carried out for the seamless steel pipe coated with plastic inside and galvanized outside. The detailed treatment steps are as follows: 1. Before shot peening, the seamless steel pipe shall be preheated to remove moisture, and the preheating temperature shall be 40 ℃ ~ 60 ℃; 2. Rust removal shall reach SA2 in GB / t8923 rust grades and rust removal grades of steel surfaces before coating Grade 5, the surface anchor depth of seamless steel pipe is 40 μ m~100 μ m; 3. The residual rust dust on the surface of seamle...

Russian Tee Pipe Fittings Project

 In June of this year, we received an inquiry from regular Russian customer about the tee pipe fittings. The pipe is welded by two steel pipes, and three flanges are welded to the pipe ends. When received the customer's inquiry, our technical department carefully studied the drawings, discussed the technical problems in the drawings, gave our best welding production plan, and promptly gave the customer feedback on the price. Before the project was confirmed, we discussed and communicated the parameters in the drawings several times with the customer. Our technicians pointed out some unreasonable parameters of the drawings and provided solutions according to production experience. The proposal has been recognized by customers. After the order was confirmed in September, we immediately started to purchase raw materials, conducted raw material quality inspections, and started the welding work at random. After 20 days, we successfully completed the production, and arranged for the qual...

Definition and application of carbon steel seamless pipe

 Definition of carbon steel seamless steel pipe: carbon steel seamless steel pipe is a kind of long steel with hollow section, which is widely used as pipeline for conveying fluid, such as pipeline for conveying water, natural gas, oil, gas and some solid materials. Compared with solid steel such as round steel, steel pipe has the same flexural and torsional strength and light weight. It is an economic section steel. It is widely used in the manufacture of structural parts and mechanical parts, such as oil drill pipe, automobile transmission shaft, bicycle frame, and the structure and modeling in the construction of roads, bridges, wharfs and airports. Application of carbon steel seamless steel pipe: Carbon steel seamless steel pipe is a kind of long steel with. The steel pipe has a hollow section, which can be divided into round pipe and special-shaped pipe according to the shape of cross-sectional area. Because the circular area is the largest under the condition of equal circumf...

Confirm South Africa stockist order within one week

 At the end of Sept, 2019, Xinyue received a new inquiry from the old customers from South Africa. Though we have regular business relationship . this inquiry as a little complicated. As the strict requirement on material and the limited quantity. Due to our Xinyue nearly 30 years experience in steel products field. We gave our customer an efficient & professional plan and quotation. The two parties reached the cooperation very soon. It only took one week on negotiation, we finished the order and delivered within 2 weeks. We used to and will always try our best to serve every customer . Xinyue Steel Group, as a professional and diversified steel manufacturer and stockist, our products are widely used in oil and gas pipelines, water pipelines, construction, dredging and piling projects. Xinyue always returns customers with the best product quality and service, and strives for 100% customer satisfaction. Xinyue steel is your most reliable partner. Welcome to cooperate with you ag...

Stainless Pipe Order from New French Client

 At the beginning of June, we received a stainless pipe inquiries from a french customer' on the Ali platform. He would like to purchase products for their own projects. Therefore the quality requirements are high. But the customers themselves are not very familiar with the products, so at first, the materials and specifications of the required products are ambiguous. Under such circumstance, we confirmed the application of their products in detail with the customers. After repeated confirmation, the customers expressed the stainless steel seamless pipes they needed. We provide customers with a number of commonly used materials for the steel pipe, providing detailed physical and chemical properties and other testing data. The customer finally selected the material for the project and confirmed the final steel pipe specifications through multiple communications. Communication before and after confirmed about a month. Although the customer has been changing the size of the steel pipe...

25 Meters Pile Pipe Arrival at Port and Loading Successfully

 Tianjin Xinyue just shipped 1000 tons steel pipe last month. This batch of anti-corrosion steel pipe is epoxy paint, the customer requests SA 2.5 sandblasting. Due to the single weight of up to 19 tons and besides 25 meters in length, it is a quite difficult for sandblasting. Nonetheless, Tianjin Xinyue professional anti-corrosion technical team overcame the difficulties, did not give up any a chance to challenge and promote ourselves. After various considerations by our technical team, we adjust and test the sandblasting equipment many times finally we overcame various difficulties and finished the production on time to catch up with the bulk vessel in October. Because the steel tube is too heavy to be carried by ordinary trucks, it must be found special trucks to carry the heavy goods. Xinyue spend only 2 days to deliver more than 1000 tons of anti-corrosive steel pipe, and all arrived at port smoothly and safely. This is inseparable from deployment capacity of Xinyue logistics ...