Korean precision machinery selects Xinyue hot rolled seamless steel pipe for processing

Project location:Korea Product:Hot rolled seamless steel pipe Standard and material:ASTM A106 GRB/APL 5LB/STKM 13A Specifications: 180MM*25MM 194MM*30MM 232MM*20MM Application:For precision machining Inquiry time:2022.03.11 Order time:2022.03.17 Shipping time:2022.04.08 Arrival time:2022.04.11 This order comes from South Korea. Only one month after the completion of the last order, the customer contacted Xinyue again, indicating that the last batch of goods was highly recognized by the end user, also won economic benefits for our customer again. This batch of products are still used for the production of similar machinery. After summarizing the experience of the last order, Xinyue continued to recommend hot-rolled seamless steel pipes for the customer and quickly confirmed the”Key points” such as ovality, curvature and average wall thickness. Previous orders gave customer with the impression of “excellent products, good service and fast delivery”. Our company is confident that customer...

New batch of custom flanges and fittings are being produced smoothly

Project Location: Australia Product: Retaining rings & End plates Specification: DN650 Class 600 Standard & Grade:F65 & ASTM A105 Usage: slurry transmission project Received the inquiry in Aug 2022. Signed the contract in Sep 2022 Shipped time: In Oct 2022 At the End of Aug, Xinyue received an enquiry of 10tons Retaining rings & End plates from our regular client for mining slurry transmission project in Australia. These products are required to be produced strictly according to client drawing。Since the matched flange has been purchased locally, the required delivery time of these matched products is very urgent, which needs to be delivered to the destination within 8 weeks At present, the retaining rings & end plates are in the final machining process, have been completed more than half quantity, will be successfully completed by end of Sep. We updated the production progress to the client at the first time, and made an appointment with the their third-party inspec...

Precautions for stacking spiral steel pipe

Spiral pipe (SSAW) is a spiral seam carbon steel pipe made of strip steel coil as raw material, often warmly extruded, and welded by automatic double-wire double-sided submerged arc welding process. It is mainly used in water supply engineering, petrochemical, chemical, electric power, agricultural Fluid transportation in the fields of irrigation and municipal buildings: water supply, drainage, sewage treatment engineering, marine water transportation. For natural gas transportation: natural gas, steam, liquefied gas. Construction use: used for piling, bridges, docks, roads, buildings, offshore piling pipes, etc. There should be a certain channel between the stacking of the spiral welded pipe stacking equipment. The width of the inspection channel is generally about 0.5m. The width of the feeding channel depends on the size of the material and the transportation machinery, generally 1.5~2m. The stacking height of spiral steel pipes shall not exceed 1.2m for manual work, 1.5m for mechan...

European ERW welded pipe order

Project Location: Europe Product: ERW Steel pipe Specification: EN10219 S235 159*3*1000mm159*3*2000mm159*3*2250mm Usage: Structural steel Inquiry time: 2022.1.10 Order Time:2022.4.15 ETD: 2022.6.5 ETA:2022.7.25 Received an inquiry from a new European customer on January 10, 2022, ERW welded pipe, 159*3mm, EN10219 S235, the pipe needs to be cut into three lengths, the customer informed that this is a pipe they use regularly, and we submit a price plan After that, the customer did not reply quickly. Period through several months of follow-up and updated prices. Finally, in early April, the customer took the initiative to send an email to us to determine the final price and said that the purchase would be determined soon. We re-updated the price and delivery time to the customer. After discussing some details with the customer, the customer confirmed the order the next day. At present, the order has been successfully produced, and the shipment will be arranged after a strict inspection. h...

flange-welded steel pipes support Saudi Arabia Dredging Project

Project Location: Saudi Arabia Product:LSAW STEEL PIPE & ELBOW Specification:690*20*12M;740*20*12M Standard and Material:ASTM A53 GR B Usage: Dredging Project Inquiry Time:04.2022 Order Time:05.2022 Shipping Time:06.2022 In April 2022, when I contacted the customer for the first time, I received an inquiry from their Technical Department. The inquiry includes steel pipes, flange-welded steel pipes and flange-welded elbows, including detailed product drawings for the customer’s dredging project in Saudi Arabia. Because the project is under construction, the customer has strict requirements on the delivery time. Therefore, our Technical and factory studied the drawings carefully, then offered quotation with batch shipment delivery plan for customer. After providing customers with our previous shipment records of similar products, their company highly affirmed our production capability. And then we signed the contract within two weeks. https://www.xysteelpipe.com/flange-welded-steel-p...

Shipping On The Scene -SMLS For Airport Hydrant Fuel System Project

Project location:Thailand Product:SEAMLESS STEEL PIPE Standard and material:API 5L PSL2 GRBN Specifications:10INCH ,SCH 40 Usage:Airport Hydrant Fuel System Project Inquiry time:2022.01.12 Order time:2022.06.15 Shipping time:2022.08.20 Estimated arrival time:2022.09.10 Based on the perfect performance of the quality, quantity and guarantee period of Xinyue’s service of multiple airport fuel transportation projects, the customer found Xinyue in early 2022 and invited Xinyue to participate in the bidding of this project. So, At the beginning of this year, Xinyue participated in the airport fuel transportation project. After the bare pipe part was witnessed by a third party in June, and the quality of internal and external anti-corrosion production passed the inspection, it has been shipped in September. The innovative part of this order is that the end of the pipe we produce is attached with a dust cloth with our company logo, which is more beautiful and recognizable as a whole. https://...

LSAW pipe welded with flange & plate from Xinyue Steel to Cote D’Ivorie

Project location:Cote D’Ivorie Product:LSAW pipe welded with flange & plate Standard and material:EN10219 S355JR, EN10025 S235JR, EN1090-2 Specifications:DN400 – DN800, length in1-12m Usage:Steel prop for shoring Inquiry time:2022.06.22 Order time:2022.08.30 Shipping time:End of Dec 2022 Estimated arrival time:Fed 2023 At the end of June 2022, Tianjin Xinyue received an inquiry from a French customer for steel pipe processing parts. EN10219 S355JR steel pipe OD 406-813mm. The pipe ends are welded with rectangular plates or circular plates at different angles. At that time, the customer had 2 options in consideration: Option1: The length of pipes shall be completely consistent with the project requirements, and the finished products shall be provided at 1-31.4m; Option2: Semi finished products are supplied at 12 meters, and the customer will conduct further pipe cutting and welding processing at the project site; The advantages and disadvantages of these two options are obvious: For...

Performance and technology of high carbon steel

 High carbon steel (carbon steel tube), often called tool steel, contains from 0.60% to 1.70% carbon and can be quenched and tempered. Hammers, crowbars, etc. are made of steel with a carbon content of 0.75%; cutting tools such as drills, taps, reamers, etc. are made of steel with a carbon content of 0.90% to 1.00%. After proper heat treatment or cold drawi ng hardening, high carbon steel has high strength and hardness, high elastic limit and fatigue limit, and the cutting performance is acceptable, but the welding performance and cold plastic deformation ability are poor. Due to the high carbon content, cracks are prone to occur during water quenching, so double-liquid quenching is mostly used, and oil quenching is mostly used for small-section parts. This type of steel is generally tempered or normalized at medium temperature after quenching or used in a surface quenched state. Mainly used in the manufacture of springs and wear-resistant parts. Carbon tool steel is a high carbon ...

Trusted Vietnam Trader choose to cooperate with Xinyue Again

Project Location: Vietnam Products: PIPE FITTINGS Size: 1/2“-16 Standard: ASTM A234 WPB, ASTM A403 F304 etc Inquiry time:10th Mat, 2022 Purchase time: 17th May, 2022 Estimated Shipping time: 17 June, 2022 Estimated Arrival time: 17 July, 2022 This is the first cooperation between the customer and Xinyue in 2018 and has been working together for 4 years.The client is specialize in pipe fittings, there are many items for each inquiry. However, xinyue always give the best plan and price to the client at the first time when receiving the inquiry. The products of this contract are stainless steel pipe, seamless pipe, galvanized pipe and pipe fittings with 151 items in total. The10D elbow and orifice flange need to provide drawings and require ITP,MPS, PQR and other technical documents for approval. Xinyue focus on export for more than ten years, a professional technical team to do technical support for customers, so that customers have no worries. After signing the contract on May 17th, the...

Xinyue cooperates with customers with rapid production

Project location:Australia Product:LSAW Steel Pipe Standard and material:EN10219 S355JR Specifications:DN500 Usage:Marine Piling Construction Inquiry time:2021.10 Order time:2022.5 Shipping time:2022.7 Estimated arrival time:2022.8 In last Oct,Xinyue received a new enquiry of LSAW steel pipes with Epoxy painting from our regular client for a small jetty piling construction to Australia. The enquiry is very complex, one OD pipe but with several different length and in total quantity only several piles & less than 50tons, also required heavy thickness Epoxy painting. After several months of bidding, design changes and price updates, the project finally made good progress in this February. However, the production time left for us is very tight due to the early technical &commercial confirmation took too long time. In order to help customers catch up with the construction time by the end of August, Xinyue production and technical department launched a quick pre-production meeting, ...